FORUM EUROPE · n8n 2026 PDF
Forum Europe
DocumentBuild & Workflow Document, V2 ProducerForum Europe Audiencen8n GmbH · leadership team VenueWilhelm Studios, Berlin. Locked. Dates11 to 15 October 2026. Day 0 to Day 2 across the window. Envelope€2M cleared ceiling. €1.35M core plan, with creative headroom to be shaped with n8n. €180,000 fixed Forum Europe management fee.
Revised proposal · Version Two · Issued 06 May 2026

n8n Conference
2026.
Build & Workflow Document.

Agentic workflows at scale demand confidence, governance and technical credibility. BUILD is the founding flagship for a market that needs to see n8n as enterprise-ready, builder-loved and ahead of what comes next.

Proposed event title · BUILD Confidential · n8n GmbH only · Not for redistribution
Section 01 Where we are

Where we are.

This is the n8n Conference 2026 proposal, built around the now-locked decisions set out in the cover above. It draws on the 23 April call with n8n leadership and Forum Europe's site visits to Berlin in late April, including Anna Harrison's walk-through of Wilhelm Studios on 28 April.

The rest of the architecture carries through from the earlier thinking: the seven content pillars, the three stages (Vision, Enterprise, Builder), the named team, the €180,000 fixed Forum Europe management fee, and the proposed event title BUILD. Forum Europe's recommendation starts from a €1.35M core plan, with the €2M ceiling treated as creative headroom to be shaped with n8n across technical experience, enterprise proof, community mechanics and post-event content.

The venue is settled. Wilhelm Studios at Kopenhagener Strasse, in the Wilhelm Hallen foundry complex in north Berlin, is the room the event is now built around: cast-iron pillars, glazed pitched roofs, raw concrete, generous single-volume halls. Anna Harrison walked it on 28 April. The design that follows is anchored on its specific spaces, Hall C as the stage volume, Hall B as the community-and-expo floor, the Ferro Canteen and Ateliers for workshops and intimate formats.

Wilhelm Studios, Berlin. The venue is locked. The design is built on its rooms, not adapted to them.

This is the live version of the proposal. It supersedes the earlier pack and stands on its own. Every concept, format and number the conference depends on is set out inside this document, fully and without cross-reference.

Section 01a · The strategic case Why this needs to exist

Why this needs
to exist.

n8n does not need a conference for visibility alone. It needs a flagship gathering because the market it operates in is loud, crowded and changing fast. More AI tools, automation products and agentic workflow platforms will enter the category over the next few years. That makes the conference more important, not less. Its job is not only to create excitement around n8n now. It is to show the whole market why n8n is the platform people can trust: open enough for builders, controlled enough for enterprises, and advanced enough to sit at the cutting edge of how work gets automated.

By whole market, we mean the people who shape whether n8n becomes the category centre: builders, community leaders, enterprise buyers, agencies, systems integrators, partners, analysts, and the n8n team itself.

It makes the ecosystem visible to itself, gives enterprise buyers confidence that this is a serious platform, and helps n8n define the category it wants to lead rather than simply compete inside it.

Every major technology ecosystem eventually needs a physical centre of gravity: a place where the community gathers, the enterprise commits, and the category declares itself. For workflow automation and AI orchestration, that place does not exist yet. This is the blueprint for building it.
Section 02 Six adjustments since the call

Six adjustments
since the call.

The 23 April call surfaced six substantive shifts. Each is set out below: what changed, why, and what it means in practice for this document and for the build that follows.

Adjustment 01 of 06 Venue. Wilhelm Studios confirmed.
01.

Wilhelm Studios is the venue. The design is built on its rooms.

The venue question is closed. Wilhelm Studios at Kopenhagener Strasse, Reinickendorf, inside the wider Wilhelm Hallen foundry complex, is confirmed for 11 to 15 October 2026. The earlier proposal carried two live scenarios; that choice is now made, and this document commits to Wilhelm in full rather than hedging across two rooms.

Anna Harrison walked Wilhelm Studios on 28 April and produced the working spatial model the rest of this document is built on: Hall C, three contiguous halls at roughly 4,190 m², as the stage volume carrying all three stages; Hall B as the community-and-expo floor, catering, sponsored lounges, registration and breakouts; the Ferro Canteen as the workshop space; the Ateliers and Oat Milk Studios as cosy rooms for roundtables and one-to-one meetings.

Wilhelm gives BUILD a serious industrial base: substantial, flexible, and credible without becoming corporate. Cast-iron pillars, glazed pitched roofs, raw concrete, exposed brick. Spotify, Zalando and Google have all delivered events in the complex.

What this changes downstream: every room reference in the walked-through conference now defaults to Wilhelm. Hotel and transport planning anchors on the Wilhelm location, with a primary room block on the nearest direct-line hotels. The venue is no longer a variable in the build; it is the fixed point everything else is planned against.

Adjustment 02 of 06 Brand. A twelve-week arc, not a four-minute moment.
02.

Brand evolution as a twelve-week arc, not a four-minute moment.

The original proposal placed a brand reveal at sixteen-hundred on Day 2: lights, film, drop, cheer. n8n's actual rebrand is gradual. Colours and vibe are locked, logo to be confirmed, a July networking event teases the new register, the October conference is the consolidation point.

The four-minute moment is replaced with a twelve-week arc. Six beats: at T-12, the identity glimpsed at the July networking event (printed card, single piece of collateral, sixty-second opening film). At T-8, a single short film posted to community channels with no marketing wrap. At T-4, the full visual register surfaces in the conference programme. At T-1, seven daily content drops across the final week. At T-0, the venue at full strength on Day 1 morning. At T+1, the closing film as the year-one statement, with the Workflow Wall timelapse becoming the Year 2 launch hero asset.

Joint creative ownership between n8n's brand team and Forum Europe's creative director, established at a creative and brand meeting early in the process.

The brand and logo update is a substantive piece of work in its own right. Close cooperation between n8n's brand team and Forum Europe's creative team will shape the schedule and pace of the visual rollout as the project moves forward.
Adjustment 03 of 06 Language. Stripped of white-glove and VIP framing.
03.

Language stripped of white-glove and VIP framing throughout.

A clear comment on the 23 April call flagged the importance of getting the hospitality register right. The event should not create different tiers where some delegates are treated better than others. Treatment is shaped by what each role asks of the day, not by who they are.

The reframe is relevance-curated everywhere. The elevated lounge is curated by audience fit, not gated by seniority. The Enterprise Stage is quiet, serious, and visible from the main concourse, not hidden as a private members' club. Hospitality is curated by audience fit, not gated by status.

This is cultural to n8n, not tactical. The change runs through every page on which audience access or hospitality is described.

The elevated lounge is curated by audience fit, not gated by seniority.
Adjustment 04 of 06 Expo. One connected ecosystem floor, not a booth hall.
04.

The expo as one connected ecosystem floor, not a trade show.

Partner areas are integrated as islands inside the community space, not walled booths. The expo floor and the community lounge are the same space.

Drinks at end-of-day reception are served from the partner zones, not from a bar. Breakouts run inside the main halls in glass houses or domes, with the Ferro Canteen and Ateliers held for sessions that need a closed door, keeping the community floor unbroken.

The sponsor commercial model changes: booths become experiential hosting spaces, priced and sold differently. The €25,000 to €150,000 partner-booth revenue line in the previous draft is rebuilt under the ecosystem-floor concept; three commercial scenarios under this model are set out later in this document.

The nearest visual precedent is a craft-led, design-led activation delivered in the same venue. The Berlin production team that built it is available to Forum Europe.

Adjustment 05 of 06 Audience. The smart-fridge bridge as design directive.
05.

The smart-fridge bridge as the audience design directive.

The phrase from the call that anchored the design. The two archetypes that never cross paths at work.

The junior developer-tinker running an agency: super-flexible in tool usage, GDPR a vague concept, lives in the experimental layer. The senior security specialist: zero flexibility in tool choice, fixed stack to defend, no experimentation in working hours. They would have an amazing conversation over a drink about a humanoid robot or a smart fridge.

The smart-fridge bridge is the unifying object that joins them. Every format, activation, and spatial decision is checked against one test: does this create a shared reference point around which different kinds of n8n user can have a useful conversation without forced agendas? If yes, it goes in. If not, it does not earn its place.

The audience model that follows is built around three constituencies, community, ambassadors, partners, and a deliberate two-day rhythm. Day 1 is invitation-only, with around 750 in the room. Day 2 opens to the wider community and scales to as many as 1,400. Most of the Day 1 attendees stay through into Day 2, so the senior register holds across both days.

Adjustment 06 of 06 Content. Capability-led, not platform-led.
06.

Capability-led content, not platform-led.

Programming leads with capability, "frontier AI lab leadership", "widely-read independent technologist", "senior policy voice on agent governance", not with specific names. The conference's editorial position is durable across whatever the platform ecosystem looks like in October.

The seven content pillars are unchanged. The contrarian voice slot on each stage, on each day, remains a protected programming line.

What this means in practice: at T-12 we open the speaker pipeline with capability briefs rather than names ("frontier AI lab leadership"; "widely-read independent technologist"; "senior policy voice on agent governance"). Named speakers lock from T-8 to T-6, drawn from a wider pool that fits the brief. The contrarian slot is the last one filled, deliberately, so the line-up can absorb whatever the AI market is arguing about by October. This is the producer discipline that keeps the conference relevant whatever moves in the next five months.

Section 02a · The production challenge Four tensions, held in balance

Four tensions.
Held in balance.

The conference is built around four working tensions. Each shapes a specific design decision in the chapters that follow. Acknowledged here so the trade-offs are explicit, not buried.

Scale vs intimacy1,400 people in a conference hall can feel corporate before the first keynote. The response is to let Berlin's industrial texture do the work branded vinyl cannot, and to put live builds ahead of polished slides.
Commercial gravity vs cultural authorityThe event must carry the seriousness enterprise buyers expect and the authenticity the community will instantly detect the absence of. Enterprise threads across the programme; it is not compressed into one dominant block.
Brand vs authenticityn8n needs category maturity without losing builder credibility. The answer is technical rigour plus experiential ambition, with activations that demonstrate the product rather than the budget.
Berlin vs globalDay 1 and Day 2 serve different audiences. Day 1 is designed invitation architecture. Day 2 is a choreographed expansion. Connected neighbourhoods, separate and deliberately merge.
Section 03 The conference, walked through

Two days,
one narrative.

The two days as a single narrative inside the 11 to 15 October window. Build over the opening weekend, Day 0 evening on Tuesday 13 October, Day 1 on Wednesday 14 October, Day 2 on Thursday 15 October. At each stage: who is in the room, what happens, where it happens, and what the production beat is. All room references are to Wilhelm Studios, the locked venue: Hall C the stage volume, Hall B the community-and-expo floor, the Ferro Canteen and Ateliers for workshops and intimate formats.

Day 0 · Tuesday 13 October · Evening · 19:00 → 22:00 Founding Contributors Dinner

Day 0 evening. Founding Contributors Dinner.

Forty to fifty delegates, drawn from the maintainers and top community contributors plus selected senior meetup leaders, are invited to the Founding Contributors Dinner the night before Day 1. The dinner is hosted by n8n leadership and the n8n Berlin team. Forum Europe supports operationally where required; the relationships are n8n's to lead.

The dinner is mixed-table seating with deliberate cross-audience assignments. Senior buyer next to developer-tinker. Maintainer next to enterprise architect. Forum Europe is on hand to support where required.

The dinner is the first encounter moment of the conference. The senior anchors arrive on Day 1 morning already in conversation. Day 1 starts warm.
Capacity40 to 50 delegates
CompositionMaintainers and top contributors, plus selected senior meetup leaders
SeatingMixed tables, deliberate cross-audience
Sourcingn8n's Berlin team, n8n-led
Forum Europe roleSupport where required
Day 1 · Wednesday 14 October · Morning · 08:30 → 12:30 Arrival, Vision opens, Knowledge Buffet, Working Groups

Day 1, morning.

08:30Arrival
09:30Vision opens
10:30Knowledge Buffet
11:15Working Groups
12:30Lunch

08:30 arrival. Hall B receives the 750 Day 1 delegates. Walking-coffee is poured from a single station at the far end of Hall B, deliberately, to make the walk into the foundry hall, not at the door. Staff are facilitators, not gatekeepers.

09:30 Vision opens. Vision Stage in Hall C, entered through C1 from the cobbled main yard. Founder welcome, ten minutes; first capability-led keynote, twenty-five minutes; first contrarian voice, fifteen minutes; first fireside, thirty minutes. Total ninety minutes of mainstage in the morning. No panels.

10:30 Knowledge Buffet opens. Across the floor of Hall B: forty-five-minute short-form sessions, fifteen running concurrently, delegates choose three. Format documentation in the formats section.

11:15 Working Groups assemble. Six commissioned working groups, six tables, six Forum Europe facilitators. Working until 12:30. Output mounts on the Output Wall before lunch.

Parallel rooms are audience-led. Five to six bookable breakout rooms (twenty to fifty seats each) host partner workshops, ambassador-led meetups and community-led sessions running in parallel to the Vision Stage and Knowledge Buffet. n8n leadership appears in the room as participants and hosts; the morning's editorial weight is carried by the audience, not delivered to it.

The morning is calibrated to make Day 1 feel like a working day, not a launch day.
Day 1 audience750 delegates · partner-and-ambassador-led, not VIP-only
Composition50 leadership-signed · 500 programmatic · 200 nominated
Stages liveVision · Enterprise · Builder
Centrepiece objectsWorkstation plus four working centrepieces live in the community lounge from 08:30
Editorial teamThree working journalists embedded · same-day output team in A4 to A6
Same-day output6 to 8pp editorial summary, posted to community channels at 23:00 Day 1
Day 1 · Wednesday 14 October · Afternoon · 13:30 → 18:30 Walking Session, Reverse Showcase, Speed Match, Enterprise Anchor, drinks

Day 1, afternoon. Five canonical formats.

12:30Lunch
13:30Walking Session
14:30Reverse Showcase
15:45Speed Match
17:00Enterprise Anchor

13:30 Walking Session. Three concurrent walks, one host, one question, no slides.

14:30 Reverse Showcase. A moderated format in which enterprise operators frame real workflow problems and builders respond with practical approaches, constraints and integration paths. Seventy-five minutes.

15:45 Agency-to-Enterprise Speed Match. A structured matchmaking format: twelve-minute pre-briefed conversations between agency builders and enterprise architects across four rounds, focusing on the highest-yield pairings. Forum Europe matchmakes against the registered briefs.

17:00 Enterprise Anchor. A single named senior anchor, fireside structure, forty-five minutes. The day's editorial pivot: from "what is being built" to "what is being trusted in production".

18:30 Day 1 drinks. Drinks served from the partner islands, not from a bar. Day 0 facilitators continue table-hosting. Soft close at 21:30.

Five canonical formats. The room runs on these.

Format 01

Knowledge Buffet

45-min short-form, 15 concurrent tracks, delegates choose three. Curated, not open-call.

Format 02

Commissioned Working Groups

Six groups, one per table, each with a published artefact target and a Forum Europe facilitator.

Format 03

Walking Session

Three concurrent walks, 30 delegates and one host each. One question, no slides.

Format 04

Reverse Showcase

Enterprise buyers pitch their needs to builders. Roles reversed by design.

Format 05

Speed Match

12-min structured rounds, matchmade by Forum Europe against registered briefs.

Anchors

The room runs on these five named formats.

No invented theatre, no recycled conference shorthand.

Day 1 · Wednesday 14 October · Evening · 17:00 → 22:00 Reception · Strategic Partners Dinner · KINDL Awards · Soft close

Day 1, evening. No scene change.

17:00 to 19:30. Reception flowing into the community lounge. No scene change. Lights warm rather than dim. Drinks served at the partner islands. The same room transitions from working day into evening. The Workflow Wall is at full visibility, the day's connection patterns building across its 12 metres. The Working Group output begins mounting on the Output Wall.

19:30 to 22:00. Two parallel hospitality moments. The top fifty senior anchors plus selected strategic partners convene for the Strategic Partners Dinner inside or near the venue. In parallel, around two hundred broader community ambassadors and active community contributors are hosted at the Community Awards Dinner at KINDL, a contemporary art and brewery venue in Neukölln, sited under the Flagship-tier sponsor's programme. Awards are presented across four categories: most-active maintainer, fastest-growing meetup, best community resource of the year, the rising-contributor recognition.

The remaining delegates continue at the reception, drift to nearby restaurants in pre-arranged groups, or peel off for the evening. No programmed activity from twenty-two hundred onwards.

No scene change. The room transitions from working day into evening.
KINDL contemporary art and brewery venue, Neukölln
KINDL · Neukölln · Awards Dinner location
KINDL interior, Community Awards Dinner setting
KINDL · interior register · 200 cap
Day 2 · Thursday 15 October · Act I of III · Morning · 07:30 → 10:30 Walking-and-coffee · Community arrival · Working Group share-back

Day 2 begins. The ecosystem becomes visible.

Three-act day · Act I "community arrival" · Act II "working sessions" · Act III "shared commitment"

07:30Walking-and-coffee
08:30Community arrival
09:00Share-back
10:30Parallel programming
12:30Lunch

07:30 Walking-and-coffee. Optional, as Day 1.

08:30 to 09:00 Community arrival. Volume increases significantly as community ticket holders arrive. Day 1 attendees who carried through have a separate fast-track entrance.

09:00 to 10:30 Day 1 Working Group share-back. Single-track on the Vision Stage. The standard keynote slot is replaced by the working-group share-back. Each of three selected groups has six minutes plus four minutes of audience response. The full twelve outputs are visible on the Working Group Output Wall in the lounge for the rest of Day 2.

This is the most valuable hour of the conference because it shows what the room itself produced overnight, not what was prepared for it.
Share-backThree groups, six minutes each, plus four minutes audience response per group. The keynote slot, replaced.
Output WallTwelve riso-printed solutions. The full set of working-group outputs from Day 1, on the wall in the lounge across Day 2.
Fast-trackDay 1 attendees enter via a separate gate. Community arrives at 08:30; volume scales.
Editorial · 07:00Daily briefing. Most-cited insights, share-back highlights, day-ahead programme. Sent to all delegates.
Day 2 · Thursday 15 October · Act II of III · Midday · 10:30 → 14:00 Parallel programming · Knowledge Buffet round two

Day 2, midday. The room works.

10:30Parallel programming Round 1
12:15Transition
12:30Knowledge Buffet 2
14:00Reverse Showcase
15:30Walking Session 2

10:30 to 12:15. Parallel programming round one across all three stages. Vision continues with the day's editorial spine. Enterprise and Builder run in parallel.

12:30 to 14:00. Knowledge Buffet round two. Same logic as Day 1, with refreshed prompts drawn from the morning's working-group share-back.

Knowledge Buffet round two reuses the Hall B lounge floor without breaking it down. The Workstation continues running. Audience seats on benches and plinths along the brick. Speaker pitch under the glazed pitched roof, daylight-led.

Hall B · diagramGlazed pitched roof / cast-iron pillars / 6m Workstation / 15m Output Wall on cork / pitch under the rooflight
Format15 concurrent tracks · delegates choose three
Source materialRefreshed prompts drawn from morning share-back
Day 2 · Thursday 15 October · Act III of III · The room commits · Afternoon · 14:00 → 18:00 Reverse Showcase · Walking Session 2 · Speed Match · Closing keynote

Day 2, afternoon. The room commits.

14:00 to 15:30 The Reverse Showcase. Vision Stage. Three maintainers each present the question their tool is designed to answer and what it would take for that answer to travel into enterprise stacks. The format reverses the usual stage geometry: the people who build the tools speak from the stage, the people who run enterprise estates listen from the audience. At close, enterprise delegates identify which conversations should continue. Follow-on conversations are documented, with named owners on both sides and a six-week tracking horizon. Where genuine commercial intent emerges, it is captured and worked through Forum Europe's matchmaking layer rather than performed on stage.

15:30 to 16:00. Walking Session round two. Twelve pairs, thirty minutes.

16:00 to 18:00 Agency-to-Enterprise Speed Match. Two-hour structured session. Each agency founder gets four fifteen-minute slots with pre-booked enterprise delegates. Both sides have filled in intent in advance, so conversations start at "what can we do together" rather than "what do you do".

The output is a documented set of follow-on conversations, with named owners on both sides and a six-week deadline.

Maintainers gain a clear hearing with the buyers their work would otherwise reach only as a procurement line.

Reverse Showcase

Three maintainers, ninety minutes

Builders speak. Enterprise architects listen. Real budget is committed on the floor.

Walking Session

Twelve pairs, thirty minutes

Round two. One question, no slides. Optional, parallel to the lounge programme.

Speed Match

Four × fifteen-minute slots

Agency-to-enterprise. Pre-filled briefs. Six-week follow-on deadline with named owners.

Output

Documented follow-ons

Conversations leave the room with named owners on both sides. Tracked at T+6 weeks.

Day 2 · Thursday 15 October · Coda · Close · Brand arc T-0 · Kraftwerk Closing keynote · Brand arc T-0 · Afterparty

Closing keynote, brand arc T-0,
then Kraftwerk.

18:00 to 19:00. Closing keynote and brand arc T-0 moment. Vision Stage. The closing editorial position of the conference, anchored by a senior editorial figure. The brand arc film is shown as the final beat of the conference, summarising what the audience has been seeing for twelve weeks.

20:00 to 24:00. Kraftwerk afterparty. No lanyards at the door. Inside the venue, role identity is invisible. Capacity at eight hundred. No programmed content. Music, drinks, dancing, room.

Kraftwerk gives the conference a destination beat outside the venue, an unmistakably Berlin signature, and a separation between the working day and the night that follows. It is the recommended path.

Alternative scenario · keep the party on site

A credible variant held in reserve: keep the afterparty inside the conference venue rather than transitioning to Kraftwerk. The Vision Stage volume becomes the dancefloor; lighting and LED panels reused from the day's production; full bands on the keynote stages; capacity comfortably 800 to 1,000. Reference point: Slush, November 2024, where the conference floor became the afterparty without a venue change.

The case for it: zero attrition between programme and party. The walk to Kraftwerk loses delegates, particularly the international cohort with morning flights. Holding the room keeps the network the room produced together for one more beat. The trade-off is the loss of the Kraftwerk signature and the destination-Berlin moment. Decision held open until production design lock.

What makes Path B newly viable: Wilhelm Studios carries no noise restrictions on site. There is no curfew to design around, so a full-volume on-site afterparty with live bands runs as late as the programme wants, in the same room the conference was built in.

Kraftwerk Berlin, decommissioned power station venue
Path A · Kraftwerk · 800 cap · no lanyards at the door · the destination beat
Evening activation at Wilhelm Studios, neon installation
Path B · Wilhelm after dark · no noise restrictions, no venue change
Closing keynote60 min · Brand arc film as the final beat. Twelve weeks land in one shot.
Path A · Kraftwerk800 cap · destination beat · Berlin signature · accepts some attrition on the walk
Path B · On-siteVision Stage volume becomes the dancefloor · zero attrition · room held intact · Slush Nov 2024 reference
Decision lockProduction design lock
Year 2 hero assetT+1 · The Workflow Wall timelapse becomes the Year 2 launch asset
Section 04 The venue

The venue: Wilhelm Studios.

Wilhelm Studios is locked. It is the events arm of Wilhelm Hallen, a former iron foundry in north Berlin, over 8,000 m² of modular space: cast-iron pillars, glazed pitched roofs that bring daylight into every hall, raw concrete, exposed brick. Anna Harrison walked it on 28 April and produced the spatial model the rest of this document is built on. adidas, Boston Consulting Group, Zalando, Google, Spotify, Nike, Hugo Boss, Porsche, Deutsche Bahn and Tech Open Air have all delivered events in the complex.

Wilhelm gives the event a serious industrial base. It feels substantial without becoming corporate. That matters because BUILD needs to make n8n feel technically ambitious, enterprise-ready, and still open to the builder community.

Locked venue

Wilhelm Studios

Kopenhagener Strasse 60 to 68, Reinickendorf

Three contiguous main halls plus side halls and ateliers inside the foundry complex. The design uses Hall C as the stage volume and Hall B as the single community-and-expo floor, with smaller rooms for workshops and intimate formats.

Hall Cthe stage volume, ~4,190 m² across three contiguous halls, all three stages
Hall Bthe community-and-expo floor, arrival, registration, catering, lounges, breakouts
Ferro Canteen135 m² workshop room plus a 130 m² rooftop terrace, ten metres from the halls
Ateliers / Oat Milk Studiosroundtables, speaker spaces and one-to-one meetings
11 to 15 October 2026 · build over the opening weekend · primary room block on the nearest direct-line hotels
Why the room works for this

Two volumes, one flow

Stage volume and social volume, side by side

The plan keeps the conference legible: delegates arrive into Hall B, the social volume that carries the Workflow Wall, the Node Garden, the Workstation, the partner islands and catering, and step through to Hall C, the stage volume, for plenary moments. Hall B is the room the delegates remember; Hall C is where the programme is delivered.

No curfewno noise restrictions on site, the afterparty can stay in the room
Pre-riggedC1 carries pre-installed rigging and moving heads, less to build
Daylightpanoramic glass ceilings, fibre internet, 505A power, vehicle access to 3m / 20t
Cast-iron pillars · glazed pitched roofs · raw concrete · exposed brick · 1,000 m² + 500 m² outdoor areas
Section 04 · Wilhelm 1/2 Wilhelm Studios · the venue, walked

The room the design is built on.

What we walked. Anna Harrison walked Wilhelm Studios on 28 April. The halls are generous single volumes: cast-iron pillars in disciplined rows, glazed pitched roofs bringing daylight down the length of each hall, raw concrete floors, exposed brick. Substantial, flexible, and immediately credible on screen and on arrival.

What sits where. Hall C, the three contiguous halls, becomes the stage volume. Hall B becomes the community-and-expo floor: the Workflow Wall mounts on its long unbroken wall, the Node Garden tunnels the approach, partner islands populate the floor at deliberate distance so the room reads as a community lounge first and a partner zone second.

Working with the pillars. The cast-iron pillars require deliberate floor planning. Tiered seating at the rear of Hall C holds sightlines past the columns; the Workstation and centrepieces in Hall B sit in the bays between pillars rather than fighting them. The pillars become part of the register, not an obstacle to design around.

What stays. The pillars, the glazed pitched roofs, the concrete floors, the exposed brick, all load-bearing for the room's character and all kept.

Wilhelm Studios foundry hall, pillared volume
Anna Harrison · 28 April site visit · foundry hall, pillared volume
Wilhelm Studios pillar perspective, concrete floor
Pillar perspective · concrete floor
Wilhelm Studios conference seating mapped
Conference seating mapped
Wilhelm Studios blank canvas with daylight
Single volume with daylight

The room, in use.

Wilhelm has carried conferences, expos and galas at flagship scale. The evidence that the room works for a two-day, 1,400-delegate gathering is not theoretical; it has been done here, repeatedly, by names the enterprise audience will recognise.

Spotify conference in full flow under the glass roof
Spotify conference · full hall under the glazed roof
Trade-fair expo stands in the hall
Expo floor · partner stands integrated
Gala dinner under the glazed roof
Gala dinner · long tables under the glass
Exhibition layout in Hall C2
Exhibition register · Hall C2

Photography · Wilhelm Studios, with images by Devid Gualandris and from the Spotify All Ears production

Section 04 · Wilhelm 2/2 Wilhelm Studios · Hall C, the stage volume

Hall C. Three contiguous halls, ~4,190 m².

How Hall C is read. The three contiguous halls, C1 at 1,906 m², C2 at 1,471 m², C3 at 807 m², are entered through C1 from the cobbled main yard. C1 is the largest, with 6.9 to 10 metre ceilings, and houses the Vision Stage. Hall C carries all three stages and acts as the single plenary volume across both days: opening keynote, Day 1 mainstage, Day 2 share-back, closing.

Capacity. C1 seats 1,200 theatre, 1,600 banquet; C2 seats 700 theatre. The plenary holds the full Day 2 room with headroom. C1 carries pre-installed rigging and moving heads, so the main stage builds faster and cheaper than a bare hall.

What sits where. Three stages set in three segments. Silent-disco headsets allow deep listening with no sound bleed between stages. Tiered seating at the rear holds sightlines past the cast-iron pillars. Relay screens bring the stage close to the back of the room.

Hall B alongside. While Hall C carries the stages, Hall B holds the community lounge, the expo, catering, registration and breakouts, so the stage volume stays clear and the social volume stays warm.

Visualisation · concept image, atmosphere reference. Final seating count and stage architecture resolved at detailed production design.

Wilhelm Studios Hall C, in-situ visualisation as Vision Stage envelope
In-situ visualisation · Hall C as Vision Stage envelope · theatre seating for 1,400
Hall C1 empty, cast-iron pillars and exposed brick
Hall C1 · as found · cast-iron pillars, exposed brick
Hall C in use with delegates
Hall C · in use · the room at scale
Creative Vision · 01 Design register · material palette · three lighting states

Industrial warmth.
Everything we add is deliberate.

Wilhelm Studios gives us raw concrete, cast-iron pillars, exposed brick and a glazed roof that floods the halls with daylight. The creative direction does not fight the building. It amplifies what is already there: warmth layered onto an industrial frame, nothing cosmetic, every addition earning its place. The register is closer to a well-edited loft than a tech-conference expo hall.

Material palette

Five materials run through every touchpoint, from stage furniture to centrepiece surfaces to signage. Nothing else is introduced.

Raw concrete

The venue's own floors and walls. Left exposed wherever possible. The anchor that keeps the register honest.

Warm timber

Oak and ash. Stage furniture, the Workstation desk, workshop tables. Unvarnished, with visible grain.

Matte black steel

Signage frames, locker shells, the Node Garden armature. The structural thread that ties furniture to installation.

Amber and teal light

The two signature lighting colours. Amber for warmth and intimacy. Teal for energy and the n8n brand connection.

Living greenery

Olive trees flanking stage entrances, herb planters on workshop tables, seasonal foliage in the courtyard. Nothing artificial.

Three lighting states across the day

The lighting does more work than any single installation. Three distinct states carry the emotional arc from productive morning to cinematic close.

08:00 to 12:00

Morning daylight

The glazed roof floods the halls with natural light. Supplemented only with clean, neutral-white wash. The room feels open, productive, generous. Coffee stations and the Workstation are the warmest spots. The message: this is a working day.

12:00 to 18:00

Afternoon amber

As the programme deepens, the lighting shifts. Warm amber wash across the halls, copper uplights on the cast-iron pillars, the community lounge pools of warm light between the installations. The room draws in. Conversations slow down. The intimacy is deliberate.

18:00 onwards

Evening dramatic

October in Berlin, it is dark by six. The venue earns its keep. Stage lighting at full intensity. The Workflow Wall glowing at peak density. The glazed roof becomes a lantern visible from the street. The courtyard lit by the spill. The message: something is happening here.

Wilhelm Studios courtyard, as found
The courtyard · as found · raw cobbles, industrial frame
Wilhelm Studios courtyard, activated for an event
The courtyard · activated · proof the space transforms
Gala dinner under the glazed roof at Wilhelm Studios
Under the glazed roof · evening state · the room at its most memorable
Neon installation at Wilhelm Studios in evening light
Evening installation light · the register we are building towards
Creative Vision · 02 First-person walkthrough · arrival to close

You arrive at Kopenhagener Strasse.
This is what you see.

Not a schedule. A sensory walkthrough of the delegate experience, moment by moment, from the cobbled approach to the closing film. Each moment paired with the image that carries it.

08:30

The approach

You step out of the S-Bahn at Schonhauser Allee and walk north. The street is quiet, residential, Berlin-ordinary. Then the cobbled yard opens up and the building is there: brick, steel, glass, a former factory that never pretended to be anything else. A row of olive trees flanks the entrance. Registration is a badge tap, not a queue. Your NFC chip is live.

Approaching Wilhelm Studios through the courtyard
08:40

The Node Garden

You walk through a fourteen-metre tunnel of illuminated nodes. As your badge passes the sensor, one node lights up and a trace of light connects it to the nearest node already lit. You are now part of the network. The tunnel opens into Hall B and the scale hits: the Workflow Wall already accumulating on the far wall, the food market to the left, the Workstation running dead centre.

Render needed Node Garden tunnel, delegate POV Camera: first-person, entering the tunnel. Warm teal-white light from node fixtures on slim timber armature. One node lighting up as badge passes. Hall B visible at the far end. Evening-adjacent lighting.
09:00

Hall B, the community floor

The room is already alive. The food market is serving coffee and pastries from long timber tables. Partner islands are conversations, not booths. The Workflow Wall is a slow accumulation of light on the far wall. The Zine Press at the Workstation is already running. There is no MC, no stage call, no forced energy. The room found its own register.

Food market activation in Hall B at Wilhelm Studios
09:15

The Workstation

Six metres of working desk, daylight-lit, the Zine Press at one end and the Snail Mail Desk at the other. A designer is pulling a riso print of the morning briefing. A delegate is writing a postcard. The Working Wall behind it is still mostly blank. By tomorrow afternoon it will be covered. You pick up a coffee and read the daily intelligence sheet.

The Workstation with Zine Press and Snail Mail Desk
10:00

Hall C, the opening

You file through into the stage volume. The pillars frame the sightlines. The screen is wide and the ceiling is high. The lighting is clean, sharp, stage-ready. The opening keynote begins without fanfare, no countdown clock, no walk-on music. The room is already paying attention. Silent-disco headsets are at every seat for the afternoon when three stages run simultaneously.

Hall C Vision Stage concept render
13:00

Lunch and the afternoon shift

The food market in Hall B runs a proper lunch, not boxed catering. The lighting has shifted to the afternoon amber state. The pillars are glowing with copper uplights. The lounge zones between the installations are filling up. The Workflow Wall has noticeably more connections than this morning. Two delegates are comparing what their nodes look like.

Conference atmosphere with delegates in conversation
18:30

Evening. The venue transforms.

It is dark outside. The glazed roof is a lantern from the street. The courtyard is lit by the warm spill from the halls. The closing session plays. The Workflow Wall is at its fullest density, the entire network visible. You collect your locker, the zine, the postcards, the riso prints. You walk out through the Node Garden, still lit, into the courtyard where the coaches to Kraftwerk are waiting.

Evening atmosphere under the glazed roof
Creative Vision · 03 Seven zones · existing photography and concept renders

Space by space.
Raw, then dressed.

Seven zones that carry the conference. Each shown as the venue gives it to us, then as we intend to dress it. Where we have existing photography of the space in use, we show it. Where we need a concept render, the placeholder carries an exact brief.

Zone 01

The approach and Node Garden

The cobbled courtyard is the first thing delegates see. Olive trees line the approach. Registration is a badge tap at the gate. The Node Garden tunnel sits between the courtyard and Hall B: fourteen metres of illuminated nodes on a slim timber armature, lighting up as each delegate passes through. The transition from street to conference happens here, not at a reception desk.

Wilhelm Studios courtyard, as found
As found · the cobbled yard, industrial brick
Render 01 Node Garden tunnel, exterior approach Camera: wide, looking from courtyard into the tunnel entrance. Slim timber-and-black-steel armature. Hundreds of node-shaped warm-white fixtures. Several nodes lit (early arrivals). Hall B glow visible at far end. Morning daylight. Olive trees either side of entrance.
Zone 02

Hall B, the community floor

The social and creative heart of the conference. The Workflow Wall runs the full length of one wall. The Workstation sits at the centre. The food market, partner islands, lounge zones and the four centrepieces fill the rest. This is where delegates spend the majority of their non-stage time. The register is market hall, not expo floor: long timber tables, food stations, living greenery, warm lighting.

Hall B activated as food market for Spotify event
Hall B · activated for Spotify · the food-market register we are building on
Render 02 Hall B community floor, full dress Camera: elevated wide shot from entrance. Workflow Wall glowing on left wall (12m LED, teal-white light, node network pattern). Workstation desk centre-frame (6m timber, Zine Press running). Food market right side (long timber tables, greenery). Partner islands (not booths). Afternoon amber lighting state. 200+ delegates. Industrial pillars visible.
Zone 03

Hall C1, the Vision Stage

The largest contiguous hall at 1,906 m², with ceilings reaching 10 metres. Cast-iron pillars frame the sightlines. The Vision Stage sits at the far end with tiered seating carrying 1,200 delegates past the pillars. This is where the opening keynote lands, where the closing film plays, where the room is one room. The existing concept render shows the atmosphere we are building.

Hall C1 empty, cast-iron pillars and exposed brick
As found · cast-iron pillars, exposed brick, 10m ceiling
Hall C Vision Stage concept render
Concept render · Vision Stage dressed · theatre seating for 1,200
Zone 04

Hall C2 and C3, Enterprise and Builder stages

Two adjoining halls carrying the intimate-format stages. C2 at 1,471 m² holds the Enterprise Stage, C3 at 807 m² holds the Builder Stage. Silent-disco headsets eliminate sound bleed. The format is closer to fireside than keynote: smaller audiences, deeper conversations, audience-mic interaction. The exhibition photo shows this space already carries intimate events well at scale.

Hall C2 configured for an exhibition
C2 · in use for exhibition · the intimate-format register
Render 03 Enterprise Stage in C2, session in progress Camera: rear-of-room, looking towards stage. Fireside format: two chairs, low table, wide screen behind. 400 delegates seated, silent-disco headsets visible. Warm amber lighting. Cast-iron pillars framing the sightlines. Intimate, not grand.
Zone 05

Ferro Canteen, the workshop rooms

The former canteen space, repurposed as the workshop and breakout volume. Commissioned Working Groups run here on Day 1 afternoon: twelve groups, twelve real workflow problems, solutions produced and riso-printed for the Output Wall the following morning. The register is atelier, not classroom: working tables, good light, materials to hand.

Render 04 Ferro Canteen workshop in session Camera: mid-room, slightly elevated. Groups of 8-10 at timber workshop tables. Whiteboards and printed briefs on table. Facilitator standing. Industrial windows letting in daylight. Herbs and small plants on tables. Warm, productive, focused. Not a hotel conference room.
Zone 06

The courtyard, October evening

By 18:00 the courtyard is the transitional space between the closing session and the evening programme. Warm light spills from the halls through the glass walls. Outdoor heaters and festoon lighting carry the atmosphere. The coaches to Kraftwerk load from here. On Day 0, the Founders' Dinner is served in the courtyard under the open sky.

Wilhelm Studios courtyard activated for evening event
The courtyard · activated · evening reception atmosphere
Render 05 Courtyard, October evening, delegates departing Camera: wide, from gate looking in. Dusk/early dark. Warm amber festoon lights strung across cobbled yard. Spill of teal-white light from hall windows. Groups of delegates in conversation. Coach visible at gate. Outdoor heaters. Olive trees silhouetted. Atmospheric, not staged.
Zone 07

Day 0, the Founders' Dinner

Sixty people under the glazed roof the evening before the conference opens. Long communal tables, candlelight, no microphones, no slides. The founders and early community sit together. The tone for the two days ahead is set here, quietly, over food. The gala-dinner photograph from Wilhelm's own portfolio shows exactly the atmosphere: the glazed roof as lantern, the room small enough to hold a conversation.

Gala dinner under the glazed roof at Wilhelm Studios
Wilhelm Studios · gala dinner under the glazed roof · the exact register for Day 0
Creative Vision · 04 The installations as a delegate experiences them

The working objects, felt.

The production spec is elsewhere in this document. This is what the delegate sees, hears, touches. Each installation described as an experience, not a line item.

Experience 01

The Workflow Wall

Twelve metres of LED along the long wall of Hall B. When you arrive, it is mostly dark, a few early sparks where the first delegates tapped badges. By mid-morning, clusters are forming. By afternoon, the network is dense enough that you can see patterns: groups of people who met, regions of the room that connected, moments where the density spiked after a session ended and everyone came back to the floor. By the closing session, the wall is the picture of what the room built together. The timelapse becomes the Year 2 launch asset.

The ambient glow is visible from across the hall. It does not demand attention. It accumulates it.

Ambient LED installation at Wilhelm Studios
Reference · the ambient glow register the Workflow Wall builds on
Render 06 Workflow Wall, mid-afternoon density Camera: angled along the wall from one end. 12m LED panel, P2.5, showing an organic network graph with hundreds of connected nodes. Teal-white primary glow with amber spark animations. Delegates standing in front, some tapping badges. Hall B community floor visible behind them. Afternoon amber lighting state.
Experience 02

The Node Garden

You do not walk past it. You walk through it. Fourteen metres of tunnel, slim timber armature, hundreds of node-shaped light fixtures. Your badge triggers one. A trace of light connects your node to the nearest already-lit node. By the end of Day 1, the garden is fully lit and the traces form a web of light visible from the courtyard. At night, it is the first thing you see from the street.

Render 07 Node Garden, mid-morning, half-lit Camera: inside the tunnel, first-person perspective walking through. Slim timber-and-matte-black-steel armature. Hundreds of node-shaped warm-white fixtures, roughly half illuminated. Visible light traces connecting lit nodes. Hall B entrance visible at far end. Morning daylight filtering in from courtyard behind. One delegate ahead, badge outstretched.
Experience 03

The Workstation

The longest table in the room. Six metres of working surface, daylight-lit, staffed across both days. At one end, the Zine Press is pulling prints. At the other, the Snail Mail Desk has a small queue. In the middle, the day's intelligence briefing is laid out, the Working Group outputs are being mounted, and a designer is setting type for the afternoon edition. It is the newsroom of the conference, running in public, producing the artefacts that end up in delegate lockers and travel home.

The Workstation concept render with Zine Press and Snail Mail Desk
Concept render · the Workstation in close detail
Experience 04

The Delegate Locker

No goody bag at the door. Instead, a personal locker opened by your NFC badge. Through the day, things accumulate inside it: a postcard from someone you spoke to, a copy of the conference zine still warm from the press, riso prints of the Working Group solutions, a partner gift selected by the partner team rather than dropped into a carrier bag. You collect everything on the way out, in your own time. The artefacts the room produced for itself are the ones that travel home.

Render 08 Delegate Lockers, Hall B wall Camera: mid-height, looking along the locker wall. Matte black steel locker shells, each with a small NFC reader. A delegate tapping their badge to open one. Inside the open locker: a zine, postcards, a riso print. Hall B community floor visible in background. Clean, minimal, not airport-locker aesthetic.
Creative Vision · 05 Where the venue earns its keep

Evening and after-dark.

October in Berlin, it is dark by six. The conference does not end when the stage programme does. The venue transforms. What was a productive working environment becomes something cinematic, something you photograph, something you remember. This is the section of the day that earns the venue its fee.

The glazed roof becomes a lantern

From inside, the warm amber light fills the halls. From outside, the entire glazed roof of Wilhelm Studios glows against the Berlin sky. The building announces itself. Delegates arriving late for the evening programme see it from the street. The courtyard catches the spill.

The Workflow Wall at peak density

By the closing session, the wall carries the complete network of every delegate interaction across both days. The timelapse plays during the closing film. The density is the proof: the room connected.

Kraftwerk

Coaches from Wilhelm Studios to Kraftwerk Berlin. The afterparty is a distinct venue, a distinct register: raw concrete, monumental scale, Berlin at night. The conference closes. The evening begins somewhere else entirely.

Evening atmosphere under the glazed roof
The glazed roof · evening state · lantern from outside
Neon installation in evening light
Evening installation light · the ambient register at full intensity
Kraftwerk Berlin, afterparty venue
Kraftwerk Berlin · the afterparty venue · a different register entirely
Creative Vision · 06 Render briefs for concept visualisation

Render brief index.

Eight concept renders needed to complete the creative vision pages above. Each brief specifies the camera angle, lighting state, what is in frame, and what mood the image should carry. The venue is Wilhelm Studios, Berlin. The design register throughout is industrial warmth: raw concrete, warm timber, matte black steel, amber and teal lighting, living greenery.

R-01
Render 01 · Node Garden tunnel, exterior approach

The entrance tunnel from the courtyard side

Camera: Wide, from courtyard looking into tunnel entrance
Lighting: Morning daylight, warm-white node fixtures
In frame: Slim timber-and-black-steel armature, hundreds of node-shaped fixtures, several lit (early arrivals), Hall B glow at far end, olive trees flanking entrance
Mood: Anticipation, arrival, the threshold moment
Used in: Creative Vision 03 (Zone 01)
R-02
Render 02 · Hall B community floor, full dress

The social heart of the conference at capacity

Camera: Elevated wide shot from entrance
Lighting: Afternoon amber state, copper uplights on pillars
In frame: Workflow Wall (12m LED, teal-white, network graph) on left wall, Workstation (6m timber desk, Zine Press running) centre, food market (long timber tables, greenery) right, partner islands, 200+ delegates, industrial pillars
Mood: Warm, alive, market-hall energy
Used in: Creative Vision 03 (Zone 02)
R-03
Render 03 · Enterprise Stage in C2, session in progress

Intimate-format stage during a fireside session

Camera: Rear of room, looking towards stage
Lighting: Warm amber, focused stage wash
In frame: Fireside format (two chairs, low table, wide screen), 400 seated delegates, silent-disco headsets visible, cast-iron pillars framing sightlines
Mood: Intimate, focused, conversational
Used in: Creative Vision 03 (Zone 04)
R-04
Render 04 · Ferro Canteen workshop in session

Commissioned Working Groups in the former canteen

Camera: Mid-room, slightly elevated
Lighting: Natural daylight from industrial windows, warm supplementary
In frame: Groups of 8-10 at timber tables, whiteboards, printed briefs, facilitator standing, herbs and small plants on tables
Mood: Productive, atelier-not-classroom, focused energy
Used in: Creative Vision 03 (Zone 05)
R-05
Render 05 · Courtyard, October evening, delegates departing

The transitional moment between conference and evening

Camera: Wide, from gate looking in
Lighting: Dusk/early dark, amber festoon lights, teal-white spill from hall windows
In frame: Cobbled yard, groups in conversation, coach visible at gate, outdoor heaters, olive trees silhouetted, warm light spill from building
Mood: Atmospheric, transitional, Berlin-at-night
Used in: Creative Vision 03 (Zone 06)
R-06
Render 06 · Workflow Wall, mid-afternoon density

The LED installation accumulating the network

Camera: Angled along the wall from one end
Lighting: Afternoon amber, wall itself teal-white primary glow
In frame: 12m LED panel showing organic network graph (hundreds of nodes, connection traces), amber spark animations, delegates in front tapping badges, Hall B floor behind
Mood: Accumulation, ambient presence, the network made visible
Used in: Creative Vision 04 (Workflow Wall)
R-07
Render 07 · Node Garden, mid-morning, half-lit

Inside the tunnel as delegates pass through

Camera: First-person, inside tunnel walking through
Lighting: Warm-white node fixtures, roughly half illuminated, daylight from courtyard behind
In frame: Slim timber-and-black-steel armature, node-shaped fixtures, light traces connecting lit nodes, one delegate ahead with badge outstretched, Hall B entrance at far end
Mood: Discovery, transition, becoming part of the network
Used in: Creative Vision 04 (Node Garden)
R-08
Render 08 · Delegate Lockers, Hall B wall

The personal locker wall with a delegate collecting

Camera: Mid-height, along the locker wall
Lighting: Afternoon amber, Hall B ambient
In frame: Matte black steel locker shells with NFC readers, one delegate tapping badge, open locker showing zine/postcards/riso print, Hall B floor in background
Mood: Personal, considered, the opposite of a goody bag
Used in: Creative Vision 04 (Delegate Locker)
Eight renders total. The existing concept renders (Hall C Vision Stage, Workstation centrepieces) do not need replacement. All render placeholders in the pages above are labelled R-01 through R-08 and cross-referenced to the briefs on this page.
Section 05 · The editorial spine Two themes · seven pillars · live intelligence feed

Two anchor themes, seven pillars,
threaded across two days and three stages.

The themes carry the editorial position; the pillars carry the substance. Every session is tagged to one theme or the other, so a delegate can choose to follow the technical thread or the human thread without having to navigate by stage.

Anchor theme · 01
Connected.

The theme of the technical surface. Architecture, observability, integration, the developer experience, the agentic workflow as a systems problem. Holds the room when the conversation is about how the work gets done.

Anchor theme · 02
Human.

The theme of the people who do the work. Community, talent, employer brand, ethics, the human cost and benefit of the workflow becoming agentic. Holds the room when the conversation is about who the work is for.

Pillar 01

Architecture and integration

How agentic workflows are built, scaled and maintained.

Pillar 02

Observability, trust and reliability

How agentic workflows are monitored, governed and trusted in production.

Pillar 03

Developer experience

What it is like to build with n8n in October 2026, and how that compares to alternatives.

Pillar 04

Enterprise adoption

How real organisations are moving agentic workflows from experiment to production.

Pillar 05

Ethics and regulation

Where the policy boundaries sit, and how to build inside them.

Pillar 06

Community and open source

What the community has produced, what is shared, and what the maintainers need.

Pillar 07

Talent and employer brand

How n8n's ecosystem is reshaping the engineer-and-builder labour market. Geographic spine: DACH primary, EU secondary, UK and US tertiary on Day 2 community ticketing.


Editorial filter

The smart-fridge bridge test. Does the session create a shared reference point around which different kinds of n8n user can have a useful conversation without a forced agenda? Sessions that pass become the spine. Sessions that don't are reworked or struck.

Protected slot

The contrarian voice. Each stage, each day. Drawn from the seven pillars but staged as the dissenting view. Protected from sponsor influence.

Live Intelligence Feed · Daily briefing 07:00 · Same-day summary day-close · Conference Report T+4 · Long-form cut T+12.
Section 06 · The audience, in plain terms Two ends, one room · community · ambassadors · partners

n8n's audience does not segment by persona or seniority.

It segments by relationship to the platform: community, ambassadors, partners. That is the language the conference uses. The 23 April call surfaced two ends of the same ecosystem. Two archetypes who do not normally cross paths at work but share a platform. The conference is built to bring them into the same room.

At one end

The junior developer-tinker.

Agency-flexible. GDPR a vague concept. Lives in the experimental layer.

Between them

The unifying object is the smart fridge.

The two would have a useful conversation over a drink about it. The smart-fridge bridge is the test every format passes.

At the other end

The senior security specialist.

Zero flexibility in tool choice. A fixed stack to defend. No experimentation in working hours.

Three constituencies.

Constituency 01

Community.

The global community of users, contributors, builders, agencies, and curious developers who use n8n in production or in experiment. Day 2 opens to community presence at scale rather than confining it to a side track.

~230kTotal community register, n8n-reported ≤ 1,400Day 2 ceiling · 600 to 700 fresh + 650 to 700 carry-through
Constituency 02

Ambassadors.

A smaller, vetted layer of community members. n8n leadership describes them as "local voluntary champions": meetup leaders, city organisers, the connective tissue between n8n and its user base. Meetup-in-a-box at T-12.

~500Across thirty-plus cities, n8n-reported 50Comped on Day 2; subset on Day 1
Constituency 03

Partners.

Technology partners, integration partners, agencies and enterprise customers whose presence makes the ecosystem case visible. Hospitality islands inside the community lounge, speaker nominations, Day 0 onboarding, and seeded workflows for the Day 1 working groups.

·Held by n8n's partnership team 10 to 14Hospitality islands. Commercial model in §08.

Day 1 closed, Day 2 open. Two ends, one room.

Day 1 · Invitation-only · 750 in the room

Closed. Partner-and-ambassador-led. Relevance-curated.

Day 1 is not a day where n8n speaks at the audience. It is a day where partners and ambassadors programme the room around a shared centrepiece, with n8n leadership in the room as participants and hosts rather than as keynote subjects.

First 50
Senior anchors

Maintainers, the most active community contributors, strategic partners, editorial and policy figures. Personalised invitations from n8n leadership six months in advance, "the people we talk to on a weekly or monthly basis".

Next 500
Programmatic

Drawn primarily from the ambassador layer plus the most active community contributors. Sent at T-12 weeks with the meetup-in-a-box kit included. Signed by the n8n community lead, addressed by name.

Final 200
Peer-nominated

Peer nominations from the first fifty and the next five hundred, vetted by an n8n curation committee. Being told by a peer that you should be in the room is more credible than any algorithmic ranking.

The framing is relevance-curated, not gated by status. VIP architecture is the wrong register for this audience: the average developer would find an executive room culturally inert, and white-glove treatment runs against the values that built the platform. Day 1 is built around that objection rather than against it.

How the invitations get sent. Forum Europe can manage the invitation operations end-to-end, or play a supporting role to n8n's community lead. The split is one of the things agreed during onboarding and discovery if Forum Europe is selected. Either way, the relationships are n8n's; the operational machinery (waves, response tracking, escalations, the meetup-in-a-box distribution, the peer-nomination process) is built around how n8n wants to run it.

Day 2 · Open · up to 1,400 in the room

Community-led. Three ticket bands. Engineered fifty-fifty mix.

Day 2 opens to the community at three ticket bands plus comped ambassador and scholarship tickets. The composition is roughly fifty-fifty between Day 1 carry-through and fresh community ticket holders. That ratio is engineered, not accidental.

Carry-through
650 to 700

Day 1 attendees who stay through.

Fresh community
600 to 700

Tickets at €249 · €449 · €599.

Ambassadors · 50
Scholarship · 50
Comped 100

Across the ambassador programme; students, open-source contributors, under-represented developers.

Geographic primary DACH, EU secondary, UK and US tertiary. The "founding edition" framing leaves room for a US Year 1 edition to launch in parallel with Berlin's second year. Without the carry-through, Day 2 dilutes into a community day with little enterprise presence; with it, Day 2 holds the room composition Day 1 produced.

The audience model is the conference's answer to the question this document opened with. n8n needs to be seen as both frontier and dependable. The audience model is what makes that visible. The developer-tinker and the senior security specialist are not personas. They are two real people the conference is built to bring into the same room. They have a useful conversation. Both leave more credible than they arrived.
Section 07 · Creative direction The Workflow Wall · the Node Garden

The Node Garden welcomes the delegate.
The Workflow Wall remembers them.

Built around a small number of working objects and one visual register that runs through every diagram, every floor plan, and every brand-arc beat.

Working object · 01

The Workflow Wall.

A 12-metre LED installation along the long unbroken wall of Hall B at Wilhelm Studios. Delegate badges carry NFC chips linked to the registration record. Tap-to-tap exchanges between delegates light up the wall, with spark animations between connected nodes.

By Day 2 close, the patterns are the picture of the network the room has formed. The timelapse becomes the Year 2 launch hero asset.

Non-interactive fallback wall held against live system failure, playing a curated visual loop in the new brand register.

12.0 m × 1.8 m · P2.5 · 1,200 cd/m² · LED · NFC-driven
Working object · 02

The Node Garden.

A fourteen-metre tunnel of illuminated nodes connected by visible light traces, sited on the approach into Hall B. Each delegate's NFC badge tap at registration lights one node in the garden as they pass through, and a light trace connects their node to the closest other delegate's node already lit.

The Node Garden welcomes the delegate. The Workflow Wall remembers them.
14.0 m tunnel · NFC-lit · slim timber armature · hundreds of node-shaped fixtures
Section 07 · Creative direction continued Hall B · Wilhelm Studios

The Workstation,
plus four working centrepieces.

The community lounge is anchored by the Workstation, a single oversized working desk where the conference's daily artefacts are produced and circulated, the lounge's centre of gravity, on at all times. Around it sit four working centrepieces. The Builder Stage is a stage, not a centrepiece.

The Workstation, dominant fixture

A single oversized working desk, on at all times. Six metres long, daylight-led, staffed by Forum Europe production. The Zine Press sits at one end, the Snail Mail Desk at the other; the Working Group output is mounted, sorted and circulated from the centre run. The Workstation is where the conference's record of itself is produced in front of the delegates, across both days.

Centrepiece 01

The Working Wall

Twelve metres of blank wall with cards and markers. Delegates contribute the workflow problem they wish someone would solve. By Day 2 close, a heat-map of community pain.

Centrepiece 02

The Zine Press

A working risograph press operating at the Workstation. Delegates submit single-page contributions across the two days. Every delegate leaves with a copy of the conference zine, made by the conference itself.

Centrepiece 03

The Snail Mail Desk

A staffed postal desk where delegates write postcards to other delegates, to themselves, or to people they want to commit to following up with. Some delivered on-site; some posted in the new n8n stamp register, arriving the following Tuesday.

Centrepiece 04

The Working Group Output Wall

Empty on Day 1 morning, revealed on Day 2 morning with the twelve riso-printed solutions from the Day 1 Commissioned Working Groups. Twelve real workflow problems, twelve solutions, all read at standing height.

Operational layer · The Delegate Locker

Each delegate is allocated a personal locker on arrival, opened by NFC badge tap. Postcards from the Snail Mail Desk, copies of the conference zine from the Zine Press, partner-curated giveaways, riso prints from the Output Wall and any other artefact a delegate wishes to take with them are deposited there through the day. Delegates collect their locker contents on the way out, in their own time. The lockers do the work that a goody-bag-at-the-door would otherwise do badly: nothing is forced, nothing is missed, and the artefacts the room produced for itself are the ones that travel home.

Workstation deep frame, Snail Mail Desk and Zine Press in close detail
The Workstation, deep frame · Snail Mail Desk and Zine Press in close detail · in-situ visualisation
Section 07b · The digital layer Apps, badges, video, social and press · what the physical event also produces

The digital layer.
What the physical event also produces.

The two days at Wilhelm are the centre of gravity. Around them, a set of digital and content systems make the event more useful in the room and more valuable afterwards. Five layers are budgeted for and built into the project from kick-off.

Delegate appsA networking and matchmaking app for both days, so delegates can find each other based on the briefs they filled in at registration. Speed Match conversations are scheduled and confirmed through the app. Agenda, floor map, session voting and personal schedule all in one place.
NFC tap in and outOnce delegates register and arrive, they tap themselves into the venue, into sessions, and out at the end of the day. This gives n8n attendance data across the full event: who came, who came to what, who carried through from Day 1 to Day 2, who returned for the afterparty. The same NFC chip drives the Workflow Wall, the Node Garden and the personal locker.
Embedded video teamForum Europe's video team is part of the project from kick-off, not bolted on at T-2. The video strategy is agreed jointly during the first working phase, so the on-site shoot captures what n8n actually wants to use. Output is handed to n8n in master and social cuts, ready to leverage across social channels and the run-up to future editions.
Social monitoringTracking on the agreed event hashtag from T-12 through T+12. Real-time visibility on social conversation during the days, with a tagged archive of every public mention. Surfaces what is landing, who is amplifying, and what should be amplified back from n8n's own channels.
Press monitoringPress coverage tracked before, during and after the event. Daily clipping summaries through the build, real-time tracking on the days, full post-event press report at T+4. Press relations workstream owned by Charlie Smith (Marketing and Communications).
The digital layer is not a side project. It is how the two days in Berlin extend outwards, before and after, and how the conference's value compounds over years.
Section 07 · Creative direction continued Working object · brand · 6 beats across 12 weeks

A twelve-week arc,
not a four-minute moment.

Six beats across twelve weeks plus the closing statement. Each beat has a channel, an asset, an owner, and a working metric. Joint creative ownership between n8n's brand team and Forum Europe's creative director, established at a creative and brand meeting early in the process. Single output: the Brand Arc Storyboard.

T-12
July networking event

Identity glimpsed in card texture · 60s film

Metric · speculation in 10 days
T-8
First public asset

60s short film · community channels · no marketing wrap

Metric · share velocity 48h
T-4
Full register surfaces

Programme · Day 1 attendees · trade press

Metric · organic press 72h
T-1
Seven daily drops

Final week · community

Metric · daily comment
T-0
Day 1 morning · full strength

Node Garden · Workflow Wall

Metric · first photo 30 min
T+1
Day 2 close

Closing film · timelapse

Metric · Y2 hero
The brand and logo update is a substantive piece of work in its own right. Close cooperation between n8n's brand team and Forum Europe's creative team will shape the schedule and pace of the visual rollout as the project moves forward.
Note · Creative approach The visual concepts in this document demonstrate atmosphere, ambition and experiential quality. Developed without access to any finalised future brand system, they are illustrative rather than definitive. If appointed, Forum Europe will adapt these concepts to n8n's final visual identity while preserving the strategic intent and event architecture set out here.
Section 08 · The commercial €1.35M working target · inside the envelope · reconciled openly at T+60

€1.35M working target.
Inside the envelope.
Reconciled openly at T+60.

n8n leadership confirmed on 6 May that the working budget envelope sits at €1.5M to €2M. Forum Europe's recommendation starts from a €1.35M core plan, with the remaining headroom treated as creative working space. If appointed, we would use the first working sessions with n8n to decide where additional investment should go: richer technical experiences, stronger enterprise proof points, more ambitious live workflow demonstrations, deeper partner activations, or a more developed post-event content layer. Forum Europe's management fee is fixed at €180,000 across the full twenty-four weeks of build plus twelve months of follow-up. The disciplined procurement on each direct-cost line is the commitment. The reconciliation at T+60 is the proof.

Venue€80,000 to €110,000
Stage and set production€110,000 to €135,000
LED and the Workflow Wall€70,000 to €95,000
Lighting and AV€90,000 to €110,000
Creative production: zine press, Delegate Lockers, NFC badges, Node Garden fixtures, optional podcast booth€120,000 to €155,000
Speaker honoraria and travel€60,000 to €90,000
Ambassador and scholarship programme€60,000 fixed
Partner experience build-out€40,000 to €70,000
Digital and content (app, matchmaking, livestream, video output, post-event editorial)€60,000 to €90,000
Travel and hospitality (delegate)€35,000 to €55,000
Reception and in-venue hospitality€30,000 to €50,000
Communications and marketing€40,000 to €65,000
Contingency (approx. 8%)€80,000 to €110,000
Direct costs subtotal€875,000 to €1,135,000
Forum Europe management fee (fixed)€180,000
Total€1,055,000 to €1,315,000
€1.05M to €1.32M
Year 1 working spend

Working target lands at €1.35M including a small upper-bound buffer. Sits comfortably inside the €1.5M to €2M ceiling cleared by n8n leadership. The lower bound holds open the disciplined €1.05M build if scope is tightened.

T+60
Reconciliation

All direct costs reconciled openly to original supplier invoices, sixty days post-event.

€180k
Fee · fixed

Twenty-four weeks of build plus twelve months of follow-up. The fee does not flex with scope.

Creative production line

The Creative production line consolidates the experiential build that the earlier document treated as scattered hardware: the Workflow Wall LED hardware and software stack, the Node Garden fixtures, the NFC badge programme that drives both objects, the Zine Press riso operation across two days, the Delegate Locker bank with NFC unlocking, an optional broadcast-grade podcast booth on the expo floor, and a working margin for further creative interventions agreed at kick-off. Holding it as one line gives the creative director a single budget envelope to manage against the brief, rather than line-item negotiation across hardware, software, and consumables.

Contingency uplift

Contingency runs at approximately 8% of direct costs, raised from the 5% level at the prior envelope. The uplift reflects the founding-edition risk profile, the increased experiential build, and a deliberate buffer against late-cycle creative additions agreed in the final eight weeks before doors open. Any contingency unspent at T+60 is returned to n8n in the open reconciliation.

Section 08 · The commercial continued Three sponsor scenarios · ticket band

Three sponsor scenarios. One ticket band.

Scenario · Conservative
€240k

Six islands at an average of €40,000.

Covers the partner experience build-out and a portion of digital and content.

Scenario · Base · Target
€466k

Eight islands at three tiers (€30k / €60k / €120k), avg €58k.

The working target for Year 1. Calibrated against the ecosystem-floor model.

Scenario · Ambitious
€864k

Twelve islands at an average of €72,000.

Funds the Year 1 surplus that seeds Year 2.

Partner islands replace partner booths. Partners are sold the experiential hosting space, not the booth. The value exchange is set out at partner-pipeline launch (T-16). Five to fifteen partner stations in the base model, each with a common n8n-owned base build, demo screen, single computer, and restrained branding allowance. An adjacent workshop room with around thirty laptops supports one-hour partner-led hands-on sessions across both days.


n8n's net position, combined view.

Build cost is one part of the picture. Sponsorship and community ticket revenue offset most of it. The table below shows n8n's net outlay at three combined scenarios. All figures are working bands and firm up at contract.

Conservative scenario
Total build cost (low end of the recommendation)€1,055,000
Sponsorship (conservative · 6 islands at €40k average)€240,000
Day 2 ticket revenue (700 tickets, blended €330)€231,000
n8n net outlay€584,000
Base scenario · working target
Total build cost (€1.35M working recommendation)€1,315,000
Sponsorship (base · 8 islands at €58k average)€466,000
Day 2 ticket revenue (700 tickets, blended €380)€266,000
n8n net outlay€583,000
Ambitious scenario
Total build cost (full €2M ceiling, with named upgrades)€1,990,000
Sponsorship (ambitious · 12 islands at €72k average)€864,000
Day 2 ticket revenue (700 tickets, blended €430)€301,000
n8n net outlay€825,000
~€584k
Net outlay · base scenario

The middle path. Build at €1.35M, with sponsorship at the working target and ticket revenue at the realistic blended price.

€231k to €301k
Ticket revenue range

Based on 700 community ticket sales across the €249 / €449 / €599 band. Blended price varies with sales mix.

Open at T+60
Reconciled against actuals

Every direct cost and every revenue line opened to documentation at T+60. The bands above firm up to single figures at that point.


Sponsor philosophy.

Principle 01
Sponsors improve the experience or they are not sponsors.
Principle 02
No sponsor buys stage time.
Principle 03
The expo is designed, not rented.
Principle 04
Activations demonstrate, not decorate.
Principle 05
Transparency over exclusivity.
Principle 06
The contrarian voice slot is protected from sponsor influence.

Ticket pricing · €249 / €449 / €599 community band

Early-bird · first two weeks
€249

On-sale opens at T-10.

Standard
€449

From T-8 to event.

Contributor
€599

Carries the lounge contribution programme.

Comped · 50 + 50
100

Ambassadors plus scholarship for students, open-source contributors, under-represented developers.

The band holds against the case for tightening it (the gut-feel range from the call was €250 to €400). The early-bird and the free ambassador and scholarship programmes carry the accessibility argument; tightening the band collapses the value architecture without materially expanding accessibility.

Section 08a · Known risks, prepared responses A founding edition carries founding-edition risk · this is the register

What could break, and how we plan around it.

A serious producer plans for the things that go wrong, not just the things that go right. The risks below are the ones we have weighted as material. Each has a named mitigation, agreed at kick-off and reviewed at every critical-path checkpoint.

Brand and identity in flightn8n's brand, logo and type refresh will continue to evolve through the project cycle, and joint approvals on visual identity will take longer than a standard event-design schedule. Production schedules are built with deliberate slack on brand-dependent items (printed collateral, lit installations, on-screen identity). Locked decisions are sequenced from least visible to most visible, with a clear hold-point at T-8 after which only colour and copy-level changes are accommodated. Joint creative review cadence agreed at kick-off.
Workflow Wall and Node Garden technical resilienceThe 12-metre NFC-driven LED installation and the Node Garden tunnel are non-trivial builds for a 1,400-delegate venue. A working prototype of both is built at T-12 and stress-tested at T-6, with the venue's network conditions, badge read rates and back-end load all measured against expected peak. Technology partner is a Berlin-based interactive build firm with previous deployments at comparable scale. Both installations carry non-interactive fallbacks: the Workflow Wall has a curated visual loop ready in the new brand register, and the Node Garden has a fixed-pattern light state that runs without NFC if the back-end goes down. AV engineering presence is on-site Day 0 through Day 2.
Key-person continuityAnna Harrison carries the project at 60% allocation: production working group lead, critical-path tracker, on-site executive Day 0 to Day 2, and lead on the Berlin site visits. Continuity is held by Charlene Bowditch at director level, with named seconds on each production workstream and a formal handover protocol that activates if Anna is unavailable from T-2 onwards. The on-site team includes a deputy production lead who shadows Anna from T-1.
Speaker drop-out close to eventEach capability slot is held with a named primary, a named alternate pre-briefed at T-4, and a curated reserve list for use up to T-1. The single named Enterprise Anchor on Day 1 is double-covered. Speaker-honoraria and travel are insured in the event budget.
Day 2 ticket sales soft at T-16If early-bird sell-through is below 40% at T-16, the document allows tightening to a single-hall footprint, locked at T-8, with a direct-cost reduction of approximately €120k to €180k. The carry-through ratio from Day 1 protects the senior register regardless of fresh ticket numbers.
Partner pipeline underperformanceSponsor scenarios are scoped at conservative, base and ambitious. Below the conservative threshold (€240k by T-12), the partner-experience build is descoped without affecting the editorial spine. Partner sales conversations are tracked weekly from T-16 with named owners.
Wilhelm Studios access or build constraintsAnna walked the venue on 28 April; the spatial model is grounded in observed conditions. Critical-path checks on access, rigging, power and load-in are scheduled at T-12 and T-6 with the venue operations team. A back-up production-design pass is held in reserve for any room substitution within the Wilhelm complex.
Visa friction for non-EU delegatesBerlin in October falls outside the heaviest summer visa-processing window, which is in our favour. Speaker and ambassador invitations are issued early enough to clear UK and US Schengen processing (T-12 for confirmed names). A named visa-support contact at Forum Europe handles letters of invitation and consulate liaison for any speaker who needs it.
Travel or weather disruptionStandard event cancellation and reduction cover is held against the build. International transport disruption is monitored from T-7 with named alternates for any speakers travelling long-haul. On-site contingency plans are agreed with the venue for delegate-arrival delays.
Force majeureEvent cancellation insurance is a line item in the existing budget (covered under the Digital and content line at the operational tier). The full cover specification is set out at contract.
Naming these in print is part of the commitment. The reconciliation at T+60 reports against the risk register as well as the budget, so n8n can see what was planned for, what happened, and what was held back.
Section 09 · Why Forum Europe Not a production vendor. The strategic partner.

Why Forum Europe.

Choosing a producer for a founding-edition conference is choosing the tone of voice the event will speak in for years. Our way of working is careful and considered by design. We do not try to make every event feel like a festival, because we believe a careful, well-made event is exactly what a company building for the long term should look like. In a market this loud, we believe that kind of partner is what makes n8n look like the durable, long-term company it is.

A founding-edition flagship is not the same brief as a one-off conference. It needs a partner that holds editorial judgement, production discipline and commercial reconciliation in the same hands, and that can carry the work across years as n8n's category settles around it.

Reason 01

We take it off n8n's desk.

The team has a platform to build. They should not be sourcing venues or reconciling 140 invoices. n8n's involvement is vision, approval and a payment schedule. Every supplier contracted through Forum Europe. Every invoice reconciled openly.

Reason 02

We lead the thinking.

The editorial spine, the audience model, the working objects, the brand arc, the invitation architecture: none of it was asked for. All of it is in this document. Forum Europe operates as the editorial mind, not a reskin of a stock conference template.

Reason 03

Multi-year flagship, ready.

Offices in the UK, Belgium, Poland, Portugal, Thailand and South Africa. Local relationships in Brussels, Washington, New York, London, Sydney and across Asia. When the franchise expands in 2027 and 2028, Forum Europe is already the local partner.

Reason 04

We protect the founder vision.

Flagship events die the same death every time: vision translated through twelve suppliers until the soul is unrecognisable. The job of the integrating layer is to hold the line. n8n's brand team retains creative ownership; Forum Europe carries the weight of execution and shields the room from sponsor pressure.


Digital is what we do.

Trusted by the EU and the US administrations to convene their major regular international gatherings. Forum Europe's core practice is the digital industry: technology summits, developer conferences, regulatory convenings, and flagship events for the companies and institutions shaping how digital markets work. n8n's conference sits at the centre of what we already do.

The track record under those four reasons:

65+
Technology and policy events a year, across five continents
35 yrs
Of building rooms where communities gather

Credentials. The rooms we have built.

A non-exhaustive selection of figures who have taken the stage at Forum Europe convenings over recent years. Provided as a register of access, not a name-drop.

Government and policy

Antony Blinken · Gina Raimondo · Margrethe Vestager · Thierry Breton · Henna Virkkunen · Maria Luís Albuquerque · Alexander De Croo

Technology CEOs

Tim Cook · Mark Zuckerberg · Sundar Pichai · Pekka Lundmark · Peter Wennink · Börje Ekholm · Christian Klein · Sir Tim Berners-Lee


Forum Europe self-curated: The Digital Festival (Brussels), The Brussels Tech Summit (Brussels), the Global Spectrum Series, the Connecting series.

Forum Europe-delivered for institutional partners: Masters of Digital (for DIGITALEUROPE), EU-US Trade and Technology Council, the ICDPPC privacy commissioners' conference.

The Digital Festival, Brussels. Curated and built by Forum Europe. A festival of ideas rather than a conference, bringing senior officials, the digital industry, university-and-developer communities and creative performance into one Brussels room. Festival register, technical workshops and live performance, all in a single day.

The Brussels Tech Summit. Curated and built by Forum Europe. A self-produced summit putting senior officials, the digital industry and the developer community into one room. Workshops and fireside chats running alongside the plenary programme.

Section 08b · Responsibility and accessibility A planning commitment, not an afterthought

Responsibility and accessibility.

Detailed accessibility and responsibility planning is produced at T-16 and reviewed at every critical-path checkpoint. The headlines, committed in writing now:

Physical accessStep-free access throughout Wilhelm Studios, including Hall C stage entries, Hall B social floor, the Ferro Canteen and the Ateliers. Hearing loops on all three Vision Stage seating banks. Confirmed with the venue at T-16.
Live captioningLive captioning on all main-stage Vision sessions across both days, displayed on relay screens and available in the delegate app. Sign-language interpretation available on request, booked at T-8.
Quiet rooms and sensory accommodationA dedicated sensory-quiet room available throughout both days, in one of the Ateliers off Hall C. Low lighting, soft seating, no AV, signposted clearly.
Dietary and cultural accommodationPlant-forward catering by default. Halal, kosher, gluten-free, low-FODMAP and allergen-free options across all meal services. Catering surveyed at registration and confirmed at T-6. Prayer space available on request.
Scholarship and travel stipends50 scholarship places (already in the audience model) for students, open-source contributors and developers from under-represented backgrounds, with travel stipends for international scholarship attendees. Held against the existing €60,000 ambassador and scholarship line.
Photography and Chatham HouseClearly marked no-photography zones for closed-door enterprise sessions and the Founding Contributors Dinner. Chatham House Rule signposted at the door of any session it applies to.
Childcare and nursingNursing room available throughout both days. Childcare provision can be added on request and is held outside the working budget; quotes prepared at T-8.
The accessibility plan is published to delegates at T-8 as part of the conference information pack and confirmed in the registration flow. The full T-16 plan is shared with n8n leadership for sign-off before any of it goes external.
Section 09 · The team Named at proposal · confirmed at contract signature

Named at proposal stage.
Confirmed at contract signature.

Five named principals plus a senior experienced member of the Forum Europe team and a senior facilitator named at contract. Production partners held to Wilhelm-experienced Berlin firms.

CEO · 5%
Bruce Macfarlane
Steering committee chair

Strategic lead, senior client counsel, overall account direction. Day rate not chargeable on retainer.

Director · 15%
Charlene Bowditch
Account lead

Day-to-day relationship owner. Lead on the partner-relations workstream and the on-sale launch.

Project Director · 60%
Anna Harrison
Lead senior event manager

Operational executive. Production working group lead. Critical-path tracker owner. On-site executive Day 0 to Day 2. Led the Berlin site visits, including the Wilhelm Studios walk-through on 28 April that the venue plan is built on.

Programme · 25%
Anne-Lise Simon
Head of conference production

Speaker pipelines, editorial briefs, the contrarian voice slot. Working Groups, Reverse Showcase, Speed Match. Live Intelligence Feed direction.

Comms · 20%
Charlie Smith
Marketing & communications manager

Communications and marketing workstream lead. Brand arc execution beats one to four. On-sale launch. Daily content drops. Press relations.

Editorial · 40%
Senior Forum Europe team member
Named at contract signature

Drawn from Forum Europe's editorial network. Carries the Live Intelligence Feed and the Editorial Brief across T-20 to T+4.

Facilitation
Senior facilitator
Named at contract signature

Named senior facilitator on the floor across Day 1 and Day 2.

Production partners
Berlin · Wilhelm-experienced
Held · names confirmed at contract

Set, lighting, audio, LED Workflow Wall, broadcast capture, on-site security. The Berlin production team that built a craft-led, design-led precedent in the same venue is available to Forum Europe.

Three comparable references are provided alongside this document, drawn from Forum Europe's recent portfolio of senior tech and policy convenings. Direct contact details are sent separately to n8n leadership for outreach without Forum Europe in the loop.

Section 10 · The path Three steps to commitment, working back from doors on 14 October

Three steps to commitment.

Hear the re-pitch and press-test it. Walk the locked room together. Talk directly to comparable references. Then commit. With doors on 14 October, the build needs a decision in early June to hold the timeline comfortably.

Step · One

The re-pitch, and the challenge.

Forum Europe presents on 27 May: who we are, our read on n8n and this conference, how we envision the event at Wilhelm, and why we are the right partner. Press-test the substance on the call and after it. Forum Europe stands ready to redraft any section on twenty-four hours' notice.

Target · Wed 27 May
Step · Two

Joint working session at Wilhelm Studios.

A half-day at the locked venue with Forum Europe leadership and creative team, n8n leadership, the n8n event lead, and the n8n brand team. Walk the rooms, pressure-test the experience design, answer the operational questions that only emerge in the building. By video if scheduling does not allow.

Target · early June, before contract signature
Step · Three

Direct reference contact.

Three named referees with direct contact details, sent separately to n8n leadership for outreach. Without Forum Europe in the loop.

Kıvanç Akıl · Digital Europe
Jeremy Rollison · Samsung
Aarti Holla-Maini · UN Office for Outer Space Affairs
Target · before contract signature
Direct contact
Bruce Macfarlane · CEO
bruce.macfarlane@forum-europe.com
Charlene Bowditch · Director
charlene.bowditch@forum-europe.com
Anna Harrison · Project Director
anna.harrison@forum-europe.com

Contract signature target

Early June 2026

Programme build

Around twenty weeks to doors

Room opens

Day 1 morning · Wednesday 14 October 2026

Section 10a · What you receive after the event Post-event deliverables, in one place

What you receive after the event.

The work does not stop on Day 2 close. Below is the full list of post-event deliverables included in the €180,000 management fee, with the timing for each.

Day-close (Day 2, 22:00)Same-day editorial summary, six to eight pages, posted to community channels and emailed to all delegates. Drafted live across both days by the embedded editorial team.
T+4 (the working week after)Conference Report. Full editorial write-up of the event, with named attribution, every session covered, photography, key quotes. Designed and printed; digital version distributed to all delegates.
T+12Long-form editorial cut. The "season opener" piece for the year ahead, including the strongest material across the two days, framed as a standalone publication. Designed to outlive the event.
T+1 (the day after)The Workflow Wall timelapse, produced as a high-resolution master and a set of social cuts. The hero asset for Year 2 launch.
T+6 (six weeks after)Speed Match follow-on tracking. Every documented conversation reviewed against its named owners on both sides; status report to n8n on which ones progressed.
T+60 (sixty days after)Full commercial reconciliation. Every direct cost opened against original supplier invoices. Side-by-side with the risk register so n8n can see what was planned, what happened, and what was held back.
Rolling, T+1 onwardsThe full delegate data export (GDPR-compliant), the Working Group printed outputs as a digital archive, the daily briefing emails as a sequential record, and all photography and video assets at master and web resolutions, in one shared library.
The fee covers the work from contract through T+12, with the T+60 reconciliation as the final delivery. Everything above arrives without separate negotiation.
Section 10 · The path · Year 2 Year 2 · Berlin scaled, plus US Year 1 in parallel

Berlin grows on a proven model.
US Year 1 runs in parallel.

The architecture is built to grow. Year 1 in Berlin is the template, not the endpoint.

Track One · Berlin scales

The same architecture, deepened. Day 2 grows from 1,400 toward a 2,500 planning ceiling on what Year 1 produces. The Workflow Wall timelapse from Year 1 becomes the Year 2 launch hero asset.

Track Two · US founding edition

A second founding edition in a US city, in parallel with Berlin Year 2, at the same 750 / 1,400 scale and on the same architecture. Same team, same editorial logic, city confirmed at T+60.

Year 2 planning starts at T+60. The shape is in place; the commitments are made once Year 1 lands.
Section 11 · Event references Comparable convenings from the Forum Europe portfolio

Event references.
The rooms we have built.

A visual portfolio drawn from Forum Europe's recent work. Each event listed here shares at least one structural characteristic with the n8n Conference 2026 brief: scale, editorial ambition, venue complexity, audience seniority, or experiential register. The rest of this section walks through five comparable convenings, with photography from the events themselves.

01 · BAM Marketing Congress Belgium · annual flagship

Format variety inside one room.

Belgium's marketing flagship runs at scale, 1,650 delegates across three stages and two labs, but the design discipline is what carries the relevance: the room holds plenary keynotes, podcast formats, silent-disco breakouts, LED cube installations and dinner programming inside one continuous venue, without the expo dominating the floor.

1,650
Delegates
67
Speakers
3
Stages
2
Labs
5+
Format types
BAM silent disco wide
Silent disco · breakout format
BAM silent disco breakout
Silent disco · audience perspective
BAM silent disco audience mic
Audience-mic format inside silent disco
BAM podcast format
Live podcast format on the expo floor
BAM dinner format
Dinner programming inside venue
BAM LED cube plenary
LED cube plenary stage
BAM floor atmosphere
Floor atmosphere · community register
BAM stage Microlino
Stage activation · Microlino

Video · BAM Marketing Congress

06 · The Digital Festival, Brussels Curated and built by Forum Europe

A festival of ideas, not a conference.

A Forum Europe-produced festival in Brussels, designed from the ground up to bridge the worlds that rarely share a room: senior officials, the digital industry, university and developer communities, and creative performance. Festival register; technical workshops; live performance. A self-curated event, built end to end by Forum Europe.

Curated
by Forum Europe
Built
end to end
Brussels
festival register
07 · The Brussels Tech Summit Curated and built by Forum Europe

A self-built tech summit in Brussels.

Forum Europe's own tech summit, designed from the ground up to put senior officials, the digital industry and the developer community into a single Brussels room. Workshops and fireside chats alongside the plenary programme. A self-curated event, built end to end by Forum Europe.

Curated
by Forum Europe
Built
end to end
Brussels
officials + industry + developer
02 · EU-US Trade and Technology Council Pittsburgh · Paris-Saclay · Luleå

Transatlantic seriousness, held cleanly.

Six ministerial meetings across three years, coordinating transatlantic positions on trade, semiconductors, artificial intelligence, and emerging technology standards. Forum Europe carried programming, editorial and stakeholder layers across the cycle. Photography below from the European Commission Audiovisual Service.

6
Ministerials
3 yrs
Cycle length
10
Working groups
EU+US
Principals
TTC principals at fossil-free steel site
Principals · fossil-free steel site visit · Luleå
TTC roundtable with flags
Ministerial roundtable
Vestager at megawatt charger
Vestager · megawatt charger demonstration
Stakeholder dialogue at lectern
Stakeholder dialogue · plenary
TTC closing press conference
Closing press conference

Photography · European Commission Audiovisual Service

03 · International Conference of Data Protection and Privacy Commissioners Brussels · 2018

A serious editorial register at scale.

The annual gathering of data-protection authorities from 120 jurisdictions, plus heads of state, technology principals and civil society. The relevance to the n8n brief is the editorial register: a serious convening that carried Tim Berners-Lee on a single-track plenary, alongside dense panel programming, without losing community texture.

3,000+
Delegates
120
Jurisdictions
4
Days
Tim Berners-Lee at the lectern
Sir Tim Berners-Lee · plenary keynote
Delegate signage at venue
Delegate signage · branded venue register
Interview at European Parliament
Interview format · European Parliament setting
Panel format at ICDPPC
Panel format · single-track plenary

Video · ICDPPC Brussels 2018

04 · Global Hearth Summit Ljubljana · Slovenia · multi-day

Where the human register holds across days.

A multi-day gathering across roughly twenty venues in Ljubljana, with plenary sessions, performing arts, community rituals, deep-practice rooms and an 800-strong dance moment in the city's main square. Most relevant to the n8n brief for what it proves about hospitality, delegate-experience design, and the difference between a programmed conference and a hosted gathering.

1,000+
Changemakers
~20
Venues
3
Days
800
In the city square
Hearth Summit embrace moment
Plenary close · the human register
Hearth Summit feature programming
Feature programming · Ljubljana
Hearth Summit second feature
Performing arts in the plenary
Health innovation panel
Adjacent reference · Health Innovation Weeks
Health innovation keynote
Keynote register · daylight-led
European retreat group celebration
European retreat · client undisclosed · group format

Video · Performing arts at the Hearth Summit

05 · Masters of Digital Belgium · most recent edition

Annual flagship at scale.

Forum Europe's flagship digital policy and innovation forum, included as the most-recent reference for floor atmosphere, audience density, networking architecture and stage register at flagship scale.

Video · Masters of Digital

Annex · The working board Live Miro board · Anna's site visit, spatial planning, and brand-arc storyboard

The working board.

A live, navigable workspace that runs alongside this document. It carries the spatial planning from Anna's 28 April Wilhelm site visit, the room-by-room mapping of where each working object sits, the twelve-week brand-arc storyboard, and the current production critical path. The board is the place where the build gets resolved in detail; this document is the argument for the build.

Open in a new tab if you want to scroll the board at full size, then return here. The board is updated as decisions firm up between now and contract.

Every important software ecosystem eventually needs a physical centre of gravity. For workflow automation and AI orchestration, that place does not exist yet. This is the proposal to build it.

BUILD.
The conference that makes n8n trusted by enterprises,
loved by builders and ahead of the market.


What we are asking for

A decision in early June to appoint Forum Europe as the producer of n8n Conference 2026, so the twenty-week build to doors on Wednesday 14 October has comfortable runway.

The immediate next steps are the joint working session at Wilhelm Studios and direct contact with the three named referees. We can move on both within 24 hours of a green light.

Speak to any of us directly: Bruce Macfarlane (bruce.macfarlane@forum-europe.com), Charlene Bowditch (charlene.bowditch@forum-europe.com), Anna Harrison (anna.harrison@forum-europe.com).


BUILD should give n8n a flagship that feels trusted by enterprises, loved by builders, and ready for the market it is about to lead.

Confidential · n8n GmbH only · Not for redistribution

Prepared by Forum Europe · Build & Workflow Document, V2 · Issued 26 May 2026